Budget

The minimum budget is $660,000 Cdn, plus applicable taxes.

The budget will include the following, but is not necessarily limited to:

  • artist and design team fees
  • travel
  • materials
  • fabrication
  • engineering
  • transportation
  • installation
  • insurance
  • landscape integration
  • design of interpretive panel